Legrand RT1 User Manual

Page 6

Advertising
background image

4. Wire the time switch.

Twist the existing
wires together with
the wire leads on
the time switch as
indicated in the
drawing. Cap them
securely using the
wire nuts provided.
See Fig 4.

• Connect the green

or non-insulated
(copper) GROUND
wire from the circuit
to the GROUND
terminal on the RT1.

• Connect the power

wire from the circuit
(HOT) to the black
wire on the RT1.

• Connect the power

wire to the lamp or fan
(LOAD) to the red wire
on the RT1.

• Connect the NEUTRAL wires from the circuit to the white wire on the RT1.

5. Put the RT1 in the wall box with the time selection buttons

positioned above the ON/OFF button.

Secure it to the wall box with the screws provided.

6. Attach the new cover plate.

7. Restore power to the circuit.

Turn on the breaker or replace the fuse.

Fig 4: Switch Orientation, Wire Connections and

Wall Box Assembly

340792RevB_Eng:NEW 10/23/08 10:54 AM Page 7

Advertising
This manual is related to the following products: