Venting requirements, Installation requirements, Standard vent system chart – Maytag WED9051YW Dimension Guide User Manual

Page 2: Long vent system chart, Electrical requirements, Water (steam models only) requirements

Advertising
background image

Because Whirlpool Corporation policy includes a continuous commitment to improve

Dimensions are for planning purposes only. For complete details, see Installation

our products, we reserve the right to change materials and specifications without notice.

Instructions packed with product. Specifications subject to change without notice.

ELECTRICAL REQUIREMENTS

VENTING REQUIREMENTS

E

xhaust venting: Exhaust your dryer to the outside. 4" (102 mm)

diameter vent is required. Rigid or flexible metal exhaust vent

must be used. Do not use plastic or metal foil vet. Exhaust hood

must be at least 12" (305 mm) from the ground or any object that

may be in the path of the exhaust.

Determine vent length and elbows needed for best

drying performance:

Use following Vent System Chart to determine type of vent

material and hood combinations acceptable to use.

NOTE: Do not use vent runs longer than those specified

in Vent System Chart. Exhaust systems longer than those

specified will:

Shorten life of dryer.

Reduce performance, resulting in longer drying times

and increased energy usage.

Louvered Hood

Angled Hood

Box Hood

Exhaust hoods:

Recommended Styles:

Acceptable Style:

The dryer must be connected to the cold water faucet using new inlet hoses. Do not use old hoses. Do not overtighten.

Damage to the coupling can result.

To supply the required 3 or 4 wire, single phase, 120/240 volt, 60 Hz, AC only electrical supply (or 3 or 4 wire, 120/208 volt electrical

supply, if specified on the serial/rating plate) on a separate 30-amp circuit, fused on both sides of the line. Connect to an individual

branch circuit. Do not have a fuse in the neutral or grounding circui

t

WATER (STEAM MODELS ONLY) REQUIREMENTS

Determine vent path:

Select route that will provide straightest and most direct

path outdoors.

Plan installation to use fewest number of elbows and turns.

When using elbows or making turns, allow as much room

as possible.

Bend vent gradually to avoid kinking.

Use as few 90° turns as possible.

INSTALLATION REQUIREMENTS

Standard Vent System Chart

Number of

90° elbows

Type

of vent

Box/louvered

hoods

Angled

hoods

1

4

3

2

0

Rigid metal

Rigid metal

Rigid metal

Rigid metal

Rigid metal

64 ft. (20 m)

54 ft. (16.5 m)

44 ft. (13.4 m)

35 ft. (10.7 m)

27 ft. (8.2 m)

58 ft. (17.7 m)

48 ft. (14.6 m)

38 ft. (11.6 m)

29 ft. (8.8 m)

21 ft. (6.4 m)

The “Vent System Charts” provide venting requirements that

will help achieve best drying performance.

NOTE: Side and bottom exhaust installations have a 90° turn

inside the dryer. To determine maximum exhaust length, add

one 90° turn to the chart.

Long Vent System Chart*

Number of

90° elbows

Type

of vent

Box/louvered

hoods

Angled

hoods

1

4

3

2

0

Rigid metal

Rigid metal

Rigid metal

Rigid metal

Rigid metal

130 ft. (39.6 m)

125 ft. (38.1 m)

115 ft. (35.1 m)

106 ft. (32.3 m)

98 ft. (29.9 m)

129 ft. (39.3 m)

119 ft. (36.3 m)

109 ft. (33.2 m)

100 ft. (30.5 m)

92 ft. (28.0 m)

*For Model WED9051Y only.

W10443041B v1-D-WH.indd 2

5/7/12 2:02 PM

Advertising