Metro Starsys Workcenters Filler Kit User Manual

Workcenters, Installation instructions

Advertising
background image

Part No. INST-BBFLR25

Date: 10/09/01

Filler Kit -

25” Deep Back-to-Back Countertops

1. Use the filler plate (Qty. 2) as a template to

position units back to back as shown.

2. Level each base unit, attach to floor as required,

and secure countertops following the steps
outlined in the Starsys WorkCenters Installation
Manual. (Shipped in each base unit)

3. Locate filler plate within the back extrusion of

each unit.

4. Align holes in the filler plate with extrusion groove

as shown, fasten in place with screws provided.
(Qty. 12)

Note: Filler plates can be trimmed, punched, or
drilled to accommodate utilities as needed.

WORKCENTERS

INSTALLATION

INSTRUCTIONS

Advertising