Valet delivery cart – Metro Valet Delivery Cart User Manual

Page 2

Advertising
background image

Valet Delivery Cart

®

InterMetro Industries Corporation

North Washington Street, Wilkes-Barre, PA 18705

For Product Information Call:

1-800-433-2232

Visit Our Web Site:

www.metro.com

L01-342

6/99

Information and specifications are subject to change

without notice. Please confirm at time of order.

Seat the remaining shelves
(See Fig. 6).

NOTE: Count fifteen

grooves to equally space the
shelves.

Count up fourteen grooves from the
bottom shelf and place a pair of split
sleeves on only two posts on the
same end of the cart.

Take the cut down posts and count
up twelve grooves from the bottom
and place a pair of split sleeves on
each post.

Take one of the small shelves and
lower it over the tops of the four
posts, with sleeves in place. Fit the
shelf onto the previously installed
split sleeves and seat the shelf
(See Fig. 4).

Being certain that the cut down posts
are standing vertically, slip the
special foot plates under the leveling
leg. Unscrew the leveling bolts until
they contact the foot plates.
(See Fig. 5).

2

3

4

5

7

6

With the top shelf in place, attach the
hanger tube.

Advertising