Initial electrical power-up and configuration – Olson Technology OTEB-CW-B User Manual

Page 29

Advertising
background image

26

Initial Electrical Power-Up and Configuration

1. Installer Must Be Trained in (Class IIIb) Laser Safety.

2. Caution: Ensure the laser emission key-switch is in the off position (or removed) be-

fore electrical turn-up.

3. Electrical turn Up:

a. Enable -48V

DC

electrical power to the unit. (see electrical connections section

above)

b. Ensure the power supply cards are fully inserted in the rear of the unit.

c. Front panel LED’s will go through initial illumination cycle of indication colors

(allow 10 seconds)

d. Front panel LED’s will indicate unit status after power up cycle.

e. Allow 1-2 minutes for LAN/SNMP service to be active after initial power up.

f. If the optical video input signal is at the correct operating level the Input Power

LED on the front panel should be green. (see LED troubleshooting table be-
low)

4. Communicating over RS-232 to units craft port.

a. Ensure correct serial cable pin out and gender is used and both ends are fully

mated on the unit and the PC.

b. Any serial communication “terminal” software may be used. “HyperTerm” is

one such program.

c. Key settings to be aware of for communication is as follows:

i. Serial Port - The port number of the PC where the serial cable is con-

nected.

ii. 9600 Baud

iii. No Flow Control

iv. 8 bits data

v. Parity None

vi. Stop Bits 1.

Advertising