Instructions for loading – Paslode T125-F18 Finish Nailer User Manual

Page 5

Advertising
background image

Step No. 1 – Grasp the finish nailer firmly with one hand and press the orange magazine release button at the
rear of the magazine and pull the magazine back towards you.

Step No. 2 – Insert the strip of 18 gauge finish nails with the point of the fastener facing down and place the point
of the fastener into the bottom of the magazine channel. Placing fasteners on the top of the magazine will cause
jamming.

Step No. 3 – Push the magazine firmly towards the front of the tool until it locks in place. The tool is now ready for
use.

INSTRUCTIONS FOR LOADING

5

Advertising