Mdt6n90, For the plumber, Conform to all applicable codes – Scotsman MDT6N90 User Manual

Page 4: Water inlet, Drains

Advertising
background image

FOR THE PLUMBER

CONFORM TO ALL APPLICABLE CODES

Water Inlet

Air Cooled Models: Connect a clean, potable

and cold water supply to the

3

8

” male flare at the

back of the cabinet. Install a hand valve near the

machine to control the water supply. Use

3

8

” O.D.

copper tubing.

Water Treatment: In most areas, a water filter of

some type will be useful. In areas where the water

is highly concentrated with minerals the water

should be tested by a water treatment specialist,

and the recommendations of the specialist

regarding filtration and/or treatment should be

followed.

Water Cooled Models: Connect a separate

3

8

O.D. copper line, with a separate hand valve to

control it, to the

3

8

” FPT condenser inlet at the

back of the cabinet. The water pressure to all lines

must always be above 20 psig, and below 120

psig.

Drains

Air Cooled Models: Connect a drain tube to the

one ¾” FPT drain fitting (plastic) at the back of the

cabinet, the drain line is of the gravity type, and ¼

inch per foot fall is an acceptable pitch for the

drain tubing. There should be a vent at the

highest point of the drain line, and the ideal drain

receptacle would be a trapped and vented floor

drain. Use only ¾” rigid tubing.

Water Cooled Models: In addition to the above

mentioned drain, a separate condenser drain line

must be installed. Connect it to the ½ " condenser

drain connection at the back of the cabinet.

MDT6N90

May 2001

Page 4

INLET WATER

VENTED

DRAIN

OPTIONAL

WATER

FILTER

SHUT OFF VALVE

FLOOR DRAIN

WATER COOLED

CONDENSER

WATER INLET

CONDENSER

DRAIN

Advertising
This manual is related to the following products: