Sloan WES 1000 Installation User Manual

Wes-1000 waterfree urinal

Advertising
background image

OR LESS

TRIM

13 ¾"

¼"

13 ½

½

13 ¼

¾

13

1

12 ¾

12 ½

12 ¼

12

2

11 ¾

11 ½

11 ¼

11

3

10 ¾

3 ¼

10 ½

3 ½

OR LESS

TRIM

10 ¼" 3 ¾"

10

4

9 ¾

4 ¼

9 ½

4 ½

9 ¼

4 ¾

9

5

8 ¾"

5 ¼

8 ½

5 ½

8 ¼

5 ¾

8

6

7 ¾

6 ¼

7 ½

6 ½

7 ¼

6 ¾

7

7

OR LESS

TRIM

6 ¾" 7 ¼"

6 ½ 7 ½

6 ¼ 7 ¾

6

8

5 ¾ 8 ¼

5 ½

8 ½

5 ¼

8 ¾

5

9

4 ¾ 9 ¼

4 ½ 9 ½

4 ¼ 9 ¾

4

10

1-888-SLOAN-14 (888-756-2614)

[email protected]

CUSTOMER SERVICE

INCORRECT

Not centered

CORRECT

Centered

A

½"

to

¾"

9¾"

for ADA

installation

standard 24" rim

finished floor

16 ¾"

Drain

6

½

21½

Install plastic anchor

and screw here

Install additional

screws here

11

10

12

1

2

3

4

Arrow
tab UP

1

2

3

4

A

C

B

D

E

CARTRIDGE

INSTRUCTIONS

The information in this document is subject to change without notice.
©2014 Sloan Valve Company All rights reserved.
0816483 Rev. 4 (03-14)

sloanvalve.com

CAUTION

After removing any urinal from the

drain line, it’s normal for certain naturally occurring

but

potentially hazardous sewer gases to escape

through the opening until the waterless cartridge

is installed properly into the waterless urinal. If you

need to leave an open drain line unattended after

removing the urinal from the wall, temporarily wedge paper towels or a

rag into the drain hole to reduce any outflow of sewer gases, and remove

the paper towels or rag prior to completing the urinal or cartridge

installation.

Never smoke, have an open flame, or place your nose or

mouth near open drain lines or waterless urinal housings into which

a cartridge is not yet properly installed. You also can wear a breathing

mask when removing or installing any waterless urinal or cartridge to

reduce potential exposure to any such gases.

B

B

15

16

4

14

7

3

13

9

6

2

11

12

10

8

5

1

C

D

WES-1000 WATERFREE URINAL

NEW CONSTRUCTION

INSTALLATION INSTRUCTIONS

BEFORE STARTING INSTALLATION:

IMPORTANT - Do not install on copper DWV

due to copper’s susceptibility to corrosion.

Check rough-in height to achieve 24” rim height

(17” rim height for ADA).

Check slope. Downhill slope, per code, is

essential because of waterfree urinals depend

on gravity flow.

Check DWV material. Suitable materials include

cast iron, PVC, ABS, and galvanized steel.

Shut off water supply and cap the nipple with

the 3/4” chrome cap (provided).

.

TUBE CUTTING CHART

Measure drain nipple depth (in) to find trim

length (in)

13 7/8” or more

DO NOT CUT

3 3/4” or less

DO NOT USE TUBE

SET DRAIN HEIGHT 16 3/4” from finished floor

(standard 24” rim) or 9 3/4” for ADA installation.

Threaded nipple should extend 1/2 to 3/4” from

wall.

CARRIER STUD PLACEMENT If using in-wall

carrier, set bearing as shown above.

13

21

A. Clean face of existing wall flange.

B. Install the brass flange with the clean

inspection disc.

C. Slowly pour water into the drain.

D. Use a flashlight to check the pitch/slope.

There should be no water present in the

inspection disc or nipple.

E. Remove flange after inspection.

ADJUST DRAIN TO ACHIEVE PITCH If standing

water is present (code requires 1/4” drop per

foot of drain line for proper pitch). Seal wall

according to code.

MEASURE & MARK THE ROUGH-IN If in-wall

carrier is not used. Use a 5/16” masonry bit to

drill hole, then install the hanger bracket with

one plastic anchor and screw.

LEVEL THE BRACKET THEN MARK, drill and

install two additional plastic anchors and screws.

If pre-existing bearing rods can be used, screws

are not necessary.

A. Hang the bowl on the bracket and check tall

pipe alignment, then remove the bowl and

adjust the bracket as needed.

Re-hang and re-check bowl alignment with

drain line. Tail pipe should align with center or

drain line.

B. Mark anchor holes then remove

bowl without moving hanger

bracket.

DETERMINE THE DRAIN NIPPLE DEPTH by

measuring the distance between the back of the

sanitary tee (or elbow) to the front edge of the

nipple.

A. Find the drain nipple depth on the Tube

Cutting Chart (left).

Measure and mark the specified trim length on

the insert tube at the nearest 1/4” groove.

B. Cut the tube at the groove using a sharp

utility knife to ensure a square, flat cut.

C. Clean burrs from the cut end by using emery

paper.

D. Apply lubricant to the outside of the rubber

brushing and ribbed inside area.

E. Insert the tube and brushing with arrow tab at

the top. Apply lubricant to tailpipe of housing.

PLACE THE GEAR CLAMP

and compression nut onto

the housing tailpipe.

DRILL HOLES with 5/16”

masonry bit for the lower

anchor screws and insert

plastic anchors.

HANG THE BOWL inserting

tailpipe into brushing, then install

anchor screws with washers.

TIGHTEN FLANGE BOLTS.

TIGHTEN

COMPRESSION

NUT AND GEAR

CLAMP.

POUR 5

GALLONS OF

WATER as

rapidly as

possible into

housing to

ensure good

flow and no

leaks or

standing water.

CAULK THE BOWL TO

THE WALL.

INSTALL THE

CARTRIDGE per the

cartridge instruction

sheet.

Advertising