210 grader blade parts list, 210 grader blade installation instructions, Center attachment – Smithco Diesel Super Rake 17-001 Accessories Manual User Manual

Page 41

Advertising
background image

B-19

Center Attachment

42-210 GRADER BLADE PARTS LIST

REF#

PART#

DESCRIPTION

QTY

1

HHP-18

Bridge Pin

1

/

8

2

2

42-207

Grader Blade

1

3

HBFL-516-18-075

Flange Bolt,

5

/

16

- 18 x

3

/

4

4

HNFL-516-18

Flange Whiz-Loc Nut,

5

/

16

- 18

(not illustrated)

4

4

42-386

Grader Blade Mount

1

42-210 GRADER BLADE INSTALLATION INSTRUCTIONS

1. Install Grader Blade (Ref 2) onto Attachment Lift by sliding tabs onto clevis pins and secure with Bridge

Pins (Ref 1).

2. Install Grader Blade Mount (Ref 4) on seat panel.

3. Position the Grader Blade Mount (Ref 4) to be centered on the rear of the Seat Panel as illustrated. Mark

the hole locations on the Seat Panel. Using an Ø

11

/

32

drill located the holes at the four marks made

previously. The top two holes will be drilled through the fiberglass and the steel panel and the rear holes
will be drilled through the fiberglass only.

4. Bolt the Grader Blade Mount (Ref 4) to the Seat Panel using the four

5

/

16

-18 Flange Bolts and Flange

Nuts (Ref 3).

5. The Grader Blade Mount is used for the storage of the Grader Blade when not in use. To store, turn the

Grader Blade to the position illustrated in the Grader Blade Mount Drawing and place in the Grader
Blade Mount.

6. Turn machine on and test for proper operation.

Advertising