Cm-ez-ii, Cm-ez-ii cm-e cm-ez-ii z-ii – Soundtube CM-EZ-II User Manual

Page 4

Advertising
background image

1.435.647.9555

|

800.647.TUBE

|

www.soundtube.com

Pre-construction Install Instructions

CM-EZ-II

CM-EZ-II

CM-E

CM-EZ-II

Z-II

2.

Using a screwdriver, push

release pin up to release

cam. Turn clockwise

until threads engage to

lock cam. Properly term-

inate signal wire in ceiling.

3.

Remove rubber feet from

cams, allowing room for

pre-construction bracket.

2.

Complete finishing work.

4. Set tap to proper setting.

CM-EZ-8 is factory preset

in the 70.7 Volt mode in

the 20 Watt setting

.

5.

Thread tap & signal wires

thru flexible conduit clamp.

Connect wires with wire

nuts. See tap settings on

front page of this manual

for proper settings.

6.

Push connections and

terminated tap wires

into backcan. Push

flexible conduit clamp

into backcan and tighten

clamp onto conduit.

1.

Install pre-construction

bracket with lip facing

down. Use nails or screws

to attach to joists.

8.

Done!

7.

Snap speaker into ceiling.

To Uninstall Speaker
1.

Remove grille and

locate brass release

pins (x4).

Advertising