Super Systems 13011 User Manual

Page 3

Advertising
background image

SsiManual 4505 E

13011 Probe Conditioning System


INSTALLATION

The compact JIC box is provided with flanges, each having two 1/4" mounting holes 10" apart.
Flange holes are vertically separated by 12.5".
Locate the box within about six feet of the sensor, if possible. Mount on standoffs away from
hot surfaces in order to prevent damage to the electronic components.

OPERATION

Once you have conducted the brief startup procedure outlined here, you need only sit back and
enjoy safe, effective probe conditioning. No special programs to write, no scheduled operator
routines.

With the system wired as illustrated, furnace at normal operating temperature, and the valve on
the burnoff air flowmeter closed; set the timer to 3 minutes. Turning the power on will
immediately start a timing cycle. Observe the probe temperature and O2 millivolt reading, and
increase the burnoff airflow until the millivolt reading is below 200 millivolts, preferably close
to zero. The temperature will pass through a maximum as the flow is increased, then drop to a
value close to the normal probe temperature. Burnoff will now occur each time the inner door is
opened, and then closed. A manual burnoff can be conducted simply by turning the power off
momentarily to reset the timer.

Refer to your GOLD PROBETM instruction manual for a complete description of probe
conditioning theory.



THANK YOU

We think you will be delighted with the performance of your probes once you have installed this
engineered conditioning system. If you have any questions, suggestions or problems, your
GOLD PROBETM team is only as far as your phone. We listen. And we respond. Call 1-800-
666-4330.











PROBE CONDITIONING SYSTEM MANUAL

Page 2

Advertising