Snotrace, Cable testing report – Thermon RGS User Manual

Page 6

Advertising
background image

Customer:

Contractor:

Address:

Address:

Phone No:

Phone No.

Project Reference:

Record 1: Prior to Installation

Cable Type:

Heater Length:

Heater Number:

Insulation Resistance M Ohms:

Tested By:

Date:

Witnessed By:

Date:

Record 2: After Installation

Insulation Resistance M Ohms:

Tested By:

Date:

Witnessed By:

Date:

Record 3: Final Commissioning

Panel Number:

Breaker Number:

Volts:

Ambient Temperature (deg. F):

Recorded Amps:

Tested By:

Date:

Witnessed By:

Date:

SnoTrace

RGS

Cable Testing Report

5

Advertising