Power connection and end termination kit – Thermon RGS-CFK User Manual

Page 2

Advertising
background image

RGS

TM

-CFK

Power Connection and End Termination Kit

Tools Required for Installation

Scissors, crimper/cutter, flat-blade screw-
driver, and utility knife

Kit Contents

User supplied junction box must be rated
Type 4X (water-tight) and approved for use
in ordinary locations.

Step 2:

Cut overjacket back a distance of

5" (120 mm).

Step 3:

Separate braid strands at

overjacket and pull cable back through
opening in braid.

Step 4:

Cut insulating jacket of cable back

3.5" (90 mm). Wind braid into a pigtail.

Step 5:

Skive outer matrix material from

conductors with a utility knife.

Step 6:

Peel ex-

posed wires back
from center ma-
trix and cut cen-
ter matrix away,
leaving bare conductors. Twist end of bus
wires before inserting into boot to avoid
contact with ground wire.

Step 7:

Squeeze

RTV into the sili-
cone rubber
boot and slide
over cable end.
Verify bus wires do not contact ground
wire.

Power Connection

Step 1:

Slide the junction box fitting cap,

strain relief disk, grommet, and then gland
fitting body onto the power end of cable.

Advertising