TS Performance 4110803 User Manual

Page 2

Advertising
background image

Continued

Installation of the TS Performance Power Play Mp-8

6.7L Cummins

Read all instructions and fully understand them before installing you TS Performance MP-8 module.

Disconnect the battery terminals and remove keys from ignition before installation.

Place Di-Electric Grease onto every electrical connection.


1. Remove the 18mm fuel rail valve

located on the front of the fuel rail.


2. Take valve and thread supplied nut tool

onto valve. Then place valve in a vice,
clamping down on sides of valve cap.




3. Use a wrench to unscrew supplied nut in

order to remove valve cap. Be careful to
hold end of valve while doing this! It is
spring loaded and you don’t want to
loose parts!




4. Removing metal spring, then insert the 3

supplied metal shims into valve.






5. Replace valve spring and then cap. Note

that there are 3 holes in a triangle
position on the inside of the valve cap
that does not need to be removed from
cap and should face towards spring as it
did when it was removed, hole alignment
is not necessary.

Advertising