Instructions for installation – TS Performance 4110103 User Manual

Page 2

Advertising
background image

Continued

Instructions for Installation

Place Di-Electric Grease onto every electrical connection.

1. Locate the fuel injection rail. It will be located on the side of the

engine with six steel lines that run to the injectors.

2. Now locate the fuel pressure sensor. This will be found on the rail

and will be the only connector that looks the same as the connector
on your MP-8 harness.

3. Unplug the sensor; plug the connector from the John Deere harness

in to the sensor.

4. Now plug the factory harness in to the left over connector.
5. The John Deere comes with two 8” zip ties to secure the box.
6. Route the cables away from any moving parts or places that might

damage the cable with the 8” zip ties supplied.







DO NOT unplug the MP-8 Module while the engine is running. This may result in
engine or component failure and may void warranty on the engine or MP-8.

If you have any questions contact TS Performance @ 270-746-9999






















Advertising