Installing a mezzanine board upgrade – Grass Valley K2 Media Client Field Kit Upgrade Instruction Manual Sep.24 2007 User Manual

Page 7

Advertising
background image

August 3, 2007

K2 Media Client Field Kit Upgrade Instructions

7

Installing a mezzanine board upgrade

9. Install the upgrade mezzanine board. Refer to the following illustration:

Install the four
screws attaching the
upgrade mezzanine board

Screws for P4/R1
mezzanine board

Screws for P3/R2
mezzanine board

3

Flip the codec
board over

2

Engage connectors at
both ends of mezzanine
board.

1

If installing in
P3/R2 position

Make sure both
connectors are fully
seated.

Provide support
under the codec
board when seating
connectors.

If installing in
P4/R1 position

Advertising