Installing a mezzanine board upgrade – Grass Valley K2 Media Client Field Kit Upgrade Instruction Manual Sep.24 2007 User Manual
Page 7
Advertising
August 3, 2007
K2 Media Client Field Kit Upgrade Instructions
7
Installing a mezzanine board upgrade
9. Install the upgrade mezzanine board. Refer to the following illustration:
Install the four
screws attaching the
upgrade mezzanine board
Screws for P4/R1
mezzanine board
Screws for P3/R2
mezzanine board
3
Flip the codec
board over
2
Engage connectors at
both ends of mezzanine
board.
1
If installing in
P3/R2 position
Make sure both
connectors are fully
seated.
Provide support
under the codec
board when seating
connectors.
If installing in
P4/R1 position
Advertising