Materials supplied, Equipment required – Grass Valley Trinix Back-Up Power Supplies Jan 13 2012 User Manual
Page 32
32
Trinix — Installation and Service Manual
Section 1 — Introduction
Materials Supplied
Each of the two packages includes the following items:
Equipment Required
TRX-PS-BU2400 installations:
1.75 in. (1 RU) rack space in Trinix or adjacent rack, and
2 AC power outlets, 1200 W each (total 2400 W)
For DV-33512 ONLY:
TRX-PS-33500 chassis with ORing diodes installed.
Note
Early versions of the TRX-PS33500 chassis did not include ORing diodes for
the redundant DC inputs. The installation of this back-up power supply
requires the TRX-PS-33500 chassis with the ORing diodes. To verify that
your TRX-PS-33500 chassis has the required ORing diodes, see
compare to your TRX-PS33500. The ORing diodes can be viewed through the
rear panel grill work of the TRX-33500 chassis. The diode covers about 1
square inches and is clearly visible from the rear. Contact Grass Valley if your
power supply does not have the ORing diode installed.
Table 1. Contents of Each Package.
Quantity
Description
Notes
1
Power cable assembly, power supply rack to
Trinix, 10 ft. (3 m).
1, 2
AC mains power cord kit (type varies per desti-
nation country)
1, 2
Power supply, 1200 W 48 VDC
1
Power supply rack
1 or 2
Blank panels for power supply rack
2
Small pattern 6 nut
spare
2
Split lock no. 6 washer
spare
2
4-40 x 1/4 SEMS screw
spare
4
6-32 x 1/4 SEMS screw
spare
2
1/4-20 UNC nut
spare
1
Internal lock washer
spare
1
No. 6 flat washer
spare
1
Manual
Part no. 071844303