Initial assembly – EarthQuake Chipper/Shredder 1692210 User Manual

Page 13

Advertising
background image

Page 13

GetEarthquake.com

1-800-345-6007

Initial Assembly

Figure 26. Discharge Bag - North American Models

Figure 27. Discharge Bag - Ce Models

Install Discharge Bag

This product comes with a discharge bag for collection

of debris as it exits the discharge chute. Install the bag as

shown in Figure 26 or 27.

Add engine Oil

Refer to “Engine Oil Type and Capacity” in the Regular

Maintenance section for oil type and fill procedures.

Add Fuel

Refer to “Adding Fuel” in the Operation section for fuel

specifications and filling procedures.

Pull drawstring tight.

Lift discharge

chute and slide

bag over chute.

Make sure bag

noose fits over

top of discharge

chute and notch

in chute bottom.

Slide bag over dis-

charge chute.

Make sure bag

noose fits over top

of discharge chute

and notch in chute

bottom.

Pull drawstring tight.

Slide bag over dis-

charge chute.

Make sure bag

noose fits over top

of discharge chute

and notch in chute

bottom.

Advertising