ShoreLand'r PT2555TABBP User Manual

Page 8

Advertising
background image


































AXLE
Place one of the spring bracket bushings into
the rear of the spring bracket and secure with
a 9/16” x 3 1/4” hex bolt and hex lock nut.
Repeat in other spring bracket. Position the
axle under the frame, then hook the loop end
of the spring around the bushings just
installed.
Note that if the axle is positioned too low
when trying to hook, the loops will not hook
around the bushings.

Raise the front of the springs up so they align
with the front hole of the spring bracket.
Secure in place with 9/16” X 3-1/4” hex bolts
and lock nuts. Repeat this process on the
other spring.

Tighten all axle U-bolts and spring bolts not
tightened at this time.

TIRE AND WHEEL ASSEMBLIES
Mount the tire and wheel assemblies using
the 1/2” fine threaded tapered lug nuts
provided. Tighten to 85-95 ft/lb. of torque
using the rotation pattern as shown in the
ShoreLandr’s Owners Manual. Re-torque
the lug nuts after 50 miles of driving and then
periodically thereafter.

Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028

www.shorelandr.com

0004356

Page

8

of

10

4/08/2011

Advertising
This manual is related to the following products: