ShoreLand'r SLV22L V.1 User Manual

Page 9

Advertising
background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003698

Page 9

11/02/06

V-BUNk ASSEMBLY (V-SERIES)

Position the bunks so that they are above the bunk brackets at-

tached to the front and rear crossmembers. (See Detail B) Secure

the brackets on the bunk to the upright brackets with 3/8” X 1” hex

bolts and hex lock nuts. Tighten but do not over tighten because the

bunks must be able to rotate to conform to the boat bottom.

Advertising