Echo X767000193 User Manual

Page 3

Advertising
background image

3

b

lade

c

onversion

k

it

i

nstallation

i

nstructions

2. Loosely attach bracket (D) to shield (E) and attach shield to bottom

of gear housing (F) with hardware provided.

3. Remove gearcase clamping screws (G) and loosely attach bracket

(D) to gearcase (F) with 2 - 5x35mm screws, nuts and lockwashers

provided in kit.

4. Tighten all hardware.

1. Check type of gear housing assembly on unit:

• Measure PTO shaft. If shaft is 32 mm, proceed to step 2. If

shaft is 42 mm, proceed to step 3. If shaft is 45 mm, proceed to

step 4.

2. Install short-necked upper fixing plate (Y) onto PTO shaft.

3. Install shaft collar (Z) then short-necked upper fixing plate (Y)

onto PTO shaft.

4. Install long-necked upper fixing plate (X) onto PTO shaft.

IMPORTANT

This kit can be mounted on several different style gear housings.

A long-necked upper fixing plate (X), a short-necked upper fixing

plate (Y), and a10mm shaft collar (Z) are included in the kit, and

may be required to properly mount the blade. Failure to install the

correct upper fixing plate configuration will cause the gearcase to

bind. Refer to the assembly instructions below to identify upper

fixing plate assembly.

install

optional

blade

Kit 99944200418 - Blade not included

Kit 99944200422 - Blade included

Tools Required: Locking Tool, T-Wrench.
Parts Required: Upper Fixing Plate w/ 20 mm pilot, Lower Plate, 10

mm Nut, Split Pin, Blade.

E

D

F

X

Y

Z

PTO

SHAFT

G

Advertising
This manual is related to the following products: