4  Battery Backup Systems With All-Pole Disconnection

SMA Solar Technology AG

28

Ersatzstrom-IS-en-30

Installation - Quick Reference Guide

4.2.4 Connecting the Slaves

Figure 9: Connecting the slaves

Position

Designation

Description/information

A

AC power cable

Sunny Island: connection AC2 Gen/Grid terminals L, N

TT

,

and PE

Automatic transfer switch:

Connect slave 1 to X3 terminals L2, N, and PE.
Connect slave 2 to X3, terminals L3, N, and PE.

Conductor cross-section: 10 mm² to 16 mm²

B

Measuring cable for voltage

measurement

Sunny Island: connection ExtVtg terminals L and N
Automatic transfer switch:

Connect slave 1 to X4 terminals L2 and N.
Connect slave 2 to X4 terminals L3 and N.

Conductor cross-section: 1.5 mm² to 2.5 mm²

C

DC+ cable

Battery connection
Conductor cross-section: 50 mm² to 95 mm²
Cable diameter: 14 mm to 25 mm

D

DC − cable

E

Data cable for the internal

communication in the cluster

Sunny Island: ComSync In connection
With slave 1: connection of internal communication bus of master