3 grounding busbar, 2 opening the multicluster box – SMA MULTICLUSTER BOX 36 User Manual

Page 22

Advertising
background image

7  Electrical Connection

SMA Solar Technology AG

22

MC_BOX_36-BE-en-20

Operating Manual

7.1.3 Grounding Busbar

Figure 9: Busbar for connecting the grounding conductors

7.2 Opening the Multicluster Box

1. Unlock the Multicluster Box with the switch cabinet key supplied.
2. Open the right-hand door until the door stopper clicks into place.
3. Release the left-hand door with the turning lever and open it until the door stopper clicks into

place.

Object

Description

A

Grounding connection generator

B

Grounding connection loads

C

Grounding connection PV plant

Advertising