2 connecting the control and sensor cables, Connecting the control and sensor cables – SMA AUTOMATIC SWITCH BOX L User Manual

Page 38

Advertising
background image

Electrical Connection

SMA Solar Technology AG

38

AS-BoxL-IEN084410

Installation Guide

5.9.2 Connecting the control and sensor cables

Connection procedure

1. Plug the control and sensor cable for the Sunny Backup master into the "Mstr/L1 BackupVtgCur"

socket.

2. Plug the control and sensor cable for the Sunny Backup slave 1 into the "Slv1/L2 BackupVtgCur"

socket.

3. Plug the control and sensor cable for the Sunny Backup slave 2 into the "Slv2/L3 BackupVtgCur"

socket.

☑ The control and sensor cables are connected.

Advertising