7

Commissioning

7.1

Commissioning Procedure

Procedure

See

1.

Connect to the communication interface.

Installation manual of the com-
munication interface

2.

If the display language is not set correctly, adjust the set-
tings.

Section 7.2, page 35

3.

Commission the inverter and start a self-test, if required.

Section 7.3, page 36 and
Section 7.4, page 37

7.2

Changing the Display Language

Use the following figure to check whether the display language of the inverter is set correctly. If the
display language is not correct, you can change the display language of the inverter as described
in the following. Various languages are available depending on the country data set selected.

Figure 11: Switch for setting the display language

Language

Switch S2

Switch S1

German

B

B

English / Italian*

B

A

French

A

B

Spanish / English**

A

A

* When country data set CEI 0-21 is selected, the language is Italian.

** When country data set CEI 0-21 is selected, the language is English.

Procedure:

1.

Danger to life due to electric shock

• Ensure that the inverter is disconnected from all voltage sources (see Section 10

"Disconnecting the Inverter from Voltage Sources", page 46).

7 Commissioning

SMA Solar Technology AG

Operating Manual

35

SB13-21TL-BE-en-11

Advertising
This manual is related to the following products: