4 installing the device, 1 selecting the mounting location, Installing the device – SMA SB 1100 User Manual

Page 11: Selecting the mounting location

Advertising
background image

SMA Solar Technology AG

Installing the Device

Installation Guide

SB11_12_17-IEN100132

11

4 Installing the Device

4.1 Selecting the Mounting Location

Observe the following conditions during mounting:

• The installation method and mounting location must be suitable for the weight and dimensions

of the Sunny Boy (see section 11 "Technical Data" (page 42)).

• Mount on a solid surface.
• The installation location must be accessible at all times.

• Vertical installation or tilted backwards by max. 45°.
• The connection area must point downwards.
• Never install the device with a forward tilt.
• Do not install horizontally.
• Install at eye level to allow operating modes to be read.

DANGER!
Danger to life due to fire or explosion!

Despite careful construction, a fire can occur with electrical devices.

• Do not mount the Sunny Boy on flammable construction materials.
• Do not mount the Sunny Boy near highly flammable materials.
• Do not mount the Sunny Boy in potentially explosive areas.

CAUTION!
Parts of the enclosure can get hot - Risk of burn injuries!

• Mount the Sunny Boy in such a way that it cannot be touched inadvertently during

operation.

CAUTION!
Risk of injury due to the heavy weight of the Sunny Boy!

• Take the weight of the Sunny Boy of approx. 25 kg into account for mounting.

Advertising
This manual is related to the following products: