Maintenance – Sealey PH250 User Manual

Page 3

Advertising
background image

5. MAINTENANCE

5.1.

The hoist should be thoroughly checked over at regular intervals to ensure that it is undamaged and is functioning correctly.

5.2.

Isolate from the power supply and inspect the following for any signs of damage, wear or looseness, as appropriate:

a) Lifting cable

d) Mounting brackets/bolts

b) Electrical cables/connections

e) Support structure

c) Control switch

Rectify any faults that are found, before using the hoist again.

5.3.

Reconnect to power supply and check for correct operation of the control switch and the maximum lift cut-out switch - the hoist should

stop when the counterweight (fig.2.4) lifts the cut-out arm (fig.2.5).

NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.

IMPORTANT: no liability is accepted for incorrect use of this product.

WARRANTY: Guarantee is 12 months from purchase date, proof of which will be required for any claim.

INFORMATION: For a copy of our latest catalogue and promotions call us on 01284 757525 and leave your full name and address, including postcode.

01284 757500

01284 703534

[email protected]

Sole Uk Distributor, Sealey Group,

Kempson Way, Suffolk Business Park

,

Bury St. Edmunds, Suffolk,

IP32 7AR

www.sealey.co.uk

Web

email

Original Language Version

PH250.V4 & PH400.V3 Issue: 1 - 04/03/10

Advertising
This manual is related to the following products: