Sealey GSS1508 User Manual

Page 10

Advertising
background image

Step 3: Assemble side wall panels

Place 2L the sheeting on your work table and tap or slide in 21A top channel and 21B bottom

channel. Fix and position the 32 mid wall channel by the self tapping screws. Fix 21B the bottom

channel by the self tapping screws but not 21A the top channel in this stage. Note that the small

lip of the channel is always facing out. This is to ensure that rain water can not build up inside

your shed. Repeat the same steps for 2L the other side wall.

Advertising
This manual is related to the following products: