Sealey GSS1515 User Manual

Page 12

Advertising
background image

Step 5: Assemble the front wall panel and front door.

Place 4 the sheeting on the work table. Fit 20D the top channel, 20E the bottom channel 41B the

jamb (There are pre-drilled holes for next step on both 4 and 41B and must be aligned.) and 33R

the mid wall channel to the sheeting and fix them using the self tapping screws. (Not those with

cross mark in this stage)

Fit the 41A the jamb, 42 the jamb and 23 the bottom channel in following and fix them using the

self tapping screws. (Not those with cross mark in this stage) Be aware of the joint details per the

diagrams. (Diagram B is as the same as diagram A.)

Advertising