Preparation / before installation / installation, Preparation, Required tools and materials – Livarno 7226 User Manual

Page 8: Before installation, Installation

Advertising
background image

8 GB/IE

Preparation / Before installation / Installation

Q

Preparation

Q

Required tools and materials

The tools and materials mentioned are not included
in the delivery. The details and values given are
non-binding and for guidance only. The nature of
the material depends on the individual circumstances
on site.

– Cable H03VV-2F of the required length with

wire-end sleeves (minimum diameter 2 x
0.75 mm2)

– Pencil /marking tool
– Voltage tester
– Screwdriver
– Electric drill
– Hole saw
– Edge cutter
– Ladder

Q

Before installation

Important: The electrical connection must be
carried out by a qualified electrician or someone
trained to perform electrical installations. This person
must be familiar with the features of the light and
the connection requirements.

j

Familiarise yourself with all instructions and
diagrams in this manual as well as with the
light before installation.

j

Before installation, ensure that the cable that
the light is to be attached to is not live. Remove
its fuse or switch off the automatic cutout in the
fuse box (0 position, see Fig. A).

j

Use the voltage tester to check that there is no
voltage.

Q

Installation

Mark the position of the built-in spotlights. Saw
3 holes into the place you wish to install the spot-
light with a keyhole saw (ø 68 mm) (fig. B). Please
take into account the distance between two in-

stallation spotlights. This must be at least 20 cm.

Guide the power cord (external) through the

installation opening (see Fig. C).

Insert the retaining springs

4

into the spot-

lights (see fig. E and F). The small nib of the
retaining springs

4

must lie on the outside of

the lamp‘s housing

1

.

j

Open the mains socket

8

by unscrewing the

cover

5

with a screwdriver (see Fig. G).

j

Release the cable holder

7

using a screwdriver.

Connect the power cord (external) to the termi-

nal block

6

(see Fig. G) and tighten the cable

holder

7

using a screwdriver. Pay attention

to the L / N marking (L = black or brown,
N = blue) of the connected wires. Any possibly
present green/yellow wire present is not con-
nected. As the light is Protection Class II, earth-
ing of the lamp is not required. Use a cable of
type H03VV-2F with a minimum cross-section
of 2 x 0.75 mm² and wire end ferrules.

j

Seal the mains socket

8

again by tightening

the cover

5

with a screwdriver.

j

Fit the mains connection box

8

back into the

installation opening.

j

Pull the socket

9

with its connection cable out

of each opening.

j

Place the fitting

9

of the mains socket

8

on

the bulb

2

including the lamp housing

1

and turn the bulb

2

with a ¼ turn in a clock-

wise direction until it is tight (see Fig. H).

j

Before using the downlight spots remove any
insulation from around the area of the mains
connection box

8

and the downlight spots

(see Fig. I).

Fold the two retaining springs

4

upwards and

guide the spotlight with the connection cable
into the installation opening (see fig. J). The
little nib of the retaining springs must be on the
outside of the installation opening (see fig. J).
After pushing in, the retaining springs

4

unfold

and in doing so fix the recessed spotlights in
place.

j

The downlights are now ready for use.

j

Now switch on the power supply (see Fig. L).

Advertising