Elkay 4595 User Manual

Page 2

Advertising
background image

Page 2

97460C (Rev. SIB - 6/06)

4595_FTN

Installation Instructions

1. This fountain is to be mounted on a smooth, flat, finished surface with adequate support structure. NOTE: Mounting
structure must be capable of supporting 300 lb. load on fountain.

2. Refer to rough-in for plumbing.

3. Install shut-off valve on water supply. (Valve not furnished).

4. Locate and install fountain using 3/8" minimum screws or bolts. (Screws or bolts not furnished). CAUTION: This fountain
is rated for inlet water pressure of 20-105 PSI. A pressure reducing regulator should be used if the inlet water supply
exceeds 105 PSI.

5. Connect water supply and fountain drain. Water connection and drain must comply with local codes.

6. Turn on water supply and check all connections for leaks.

FIG. 1

Advertising