P/2 da4xi and p/2 da6xi, cont’d, Rear panel features, Operation – Extron electronic P/2 DA6xi User Manual

Page 5: Front panel indicators, Vga distrib ution ampli fier, Signal input and output connections

Advertising
background image

P/2 DA4xi/6xi • Installation

P/2 DA4xi/6xi • Installation

P/2 DA4xi and P/2 DA6xi, cont’d

1

Power LED

: A green LED indicates that the distribution

amplifier is receiving power.

Rear panel features

100-240V 0.2A

INPUT

P/2 DA6xi

VIDEO GAIN

1V

.7V

3

(LOCAL MONITOR)

2

1

3

5

4

6

OUTPUTS

50/60 Hz

100-240V 0.2A

INPUT

P/2 DA4xi

VIDEO GAIN

1V

.7V

3

(LOCAL MONITOR)

2

1

3

4

OUTPUTS

50/60 Hz

P/2 DA4xi

P/2 DA6xi

1

2

3

4

5

1

Power LED

— A green LED indicates that the distribution

amplifier is receiving power.

2

Video Gain sliding switch

— Used for installations with long

output cable runs, the 1.0 V (up) position gives a brighter
picture. The default Video Gain setting is 0.7 V (down).

3

Input Connector

Connect the input cable (using VGA-UXGA

signals) to the DA’s 15-pin HD female connector.

4

Local Monitor

Connect a local monitor to this 15-pin HD

female connector for loop-through capability.

5

Output Connector

— Connect the output device to the 15-pin

HD female connector.

Operation

After the distribution amplifier and its connected devices are
powered up, the system is fully operational. If any problems
occur, verify that the cables are properly routed and connected.

Signal input and output connections

All connections, including power, input, and output are located
on the back of the rear panel of the P/2 DA4xi and P/2 DA6xi.

VGA DISTRIB

UTION AMPLI

FIER

3.

Hold the unit against the underside of the surface through
which it will be mounted. Mark the four screw holes on
the underside of the surface to which you are mounting
the device.

4.

Drill four pilot holes, each 3/32" in diameter by 1/4" deep,
where you made marks.

5.

Using the four wood screws provided, attach the brackets
to the mounting surface.

6.

Slide the unit up and down or back and forth in the
mounting brackets until the face of the unit is at the
desired height. Tighten the screws that secure the bracket
in place.

a.

Mark the location of the brackets relative to the
screws.

b.

Remove the unit from the underside of the surface.

c.

Tighten the screws.

d.

Replace the switcher on the underside of the surface
(step 5).

Front panel indicators

VGA DISTRIBUTION AMPLIFIER

1

5

4

P/2 DA4xi/6xi • Operation

Advertising