Setting up and connecting to the power supply, Handling and operation, Requirements on the installation site – Silvercrest SFS 150 B3 User Manual

Page 52: Electrical connection, Inserting the tube fi lm, Gb mt

Advertising
background image

49

SFS 150 B3

GB
MT

Setting up and connecting to the power supply

Requirements on the installation site

For safe and fl awless operation of the appliance, the installation site must comply
with the following requirements:

When setting it up, place the appliance on a fi rm, fl at and horizontal
surface.

Do not operate the appliance in a hot, wet or very humid environment or
close to combustible material.

The mains power socket must be easily accessible, so that the power cable
can be easily disconnected in the event of an emergency.

Electrical connection

IMPORTANT

Before you connect the appliance, compare the connection data (voltage
and frequency) on the data plate with that of your mains power network.
This data must match in order to avoid any damage to the appliance.

Ensure that the power cable is undamaged and is not routed over hot
surfaces and/or sharp edges.

Ensure that the power cable is not taut or kinked.

Do not let the power cable hang over edges (trip wire eff ect).

Insert the plug into a mains power socket.

Handling and operation

In this chapter you receive important information for the handling and operation
of the appliance.

Inserting the tube fi lm

Open the roll storage compartment

and insert a roll of tubular fi lm.

Fold the guide rail

of the cutting device

to the rear and pull a piece

of tube fi lm through between the guide rail

and the appliance lid.

Close the roll storage compartment

and fold the guide rail

of the

cutting device

back down.

IB_96111_SFS150B3_LB5.indb 49

04.12.13 09:24

Advertising