Installation and assembly – MCZ Flair User Manual

Page 27

Advertising
background image

25

6-INSTALLATION AND ASSEMBLY

Technical Dept. - All rights reserved - Reproduction is prohibited

It is recommended to insulate the entire length of the pipe in order to reduce dispersion and increase heat output

in the room.

If the wall that is to be drilled through is made of flammable material, the INSTALLER MUST adequately insulate the pipe of the stove that

passes through it, using suitable insulating material (1.3 - 5 cm thick with min. thermal conductivity 0.07 W/m°K).

However, the pipe inserted in the wall must be adequately insulated in order not to disperse heat and soundproof the released air.

A - STOVE

B - HOT AIR OUTLET PIPE

C - INSULATION WALL

D - INSULATION

Advertising
This manual is related to the following products: