Installation and assembly – MCZ Yari AIR User Manual

Page 24

Advertising
background image

2

3

1

4

5

a

b

c

d

22

3-INSTALLATION AND ASSEMBLY

It is good practice to guarantee effective ventilation in the room during the initial start-up, as the stove will emit

some smoke and smell of paint.

Do not stand close to the product and air the room. The smoke and smell of paint will disappear after about an hour of operation, however,

remember they are not harmful in any case.

The stove will be subject to expansion and contraction during the start-up and cooling phases, therefore light creaking noises may be

heard.

This is absolutely normal as the structure is made of laminated steel and must not be considered a defect.

It is extremely important to make sure the product is not immediately overheated and the temperature is increased gradually, initially

using low power.

This will prevent damaging the ceramic or serpentine tiles, the welds and the steel structure.

DO NOT EXPECT HEATING EFFICIENCY IMMEDIATELY!!!

SETTINGS TO BE CARRIED OUT BEFORE THE INITIAL START-UP

Once the power cable is connected in the rear part of the stove, turn the switch (fig. d), also placed at the rear, to position (I). To switch the

stove on or off press keys 2 + 3 on the remote control (fig. a+b) or key 5 on the control panel.

The stove will begin its start-up phase, lasting approximately 15 minutes, and will then go into normal operation.

It is already possible to use the control panel during the start-up phase, however, the effect of this setting will only be

implemented once the stove is ignited.

Advertising