INSTALLATION AND USE MANUAL

Chapter 3

GOYA

page

9

Chapter 3

Technical service – all rights reserved by mcz spa

Reproduction prohibited

3.4. PHASE 3 – PREPARATION OF WALL FOR RECESSED INSTALLATION

Prepare the recessed installation wall with fireproof material, such as fireproof plasterboard. Provide an opening

of 685X645 mm, 350 mm above the floor.

64

5

685

35

0

PARETE D'INCASSO

It is advisable to make 4 pass-through holes D=13 mm in the positions shown in the drawing. The holes are used

to facilitate the fastening of the Goya frame to the wall for recessed installation. It is advisable to check on-site

the exact position by placing the Goya frame near the wall.

20

0

48

0

361

FORO

Ø13 MM

361

FORO

Ø13 MM

SCHEMA POSIZIONE FORI