3.12. PHASE 11 - ANCHORING TOP TO CEILING

Installation of the Modigliani cladding is completed by anchoring the top (element 4) to the ceiling and, hence, all

of the structure upon which the hood will rest.
Fasten the top with the steel tie provided. Anchor the tie to the ceiling as vertically as possible (pay attention to

the hold, considering the weight of the hood) and adjust the level of tension using the tensioner.

Phase 11 concludes installation of the cladding+unit. You can now proceed with in-location realization of the

hood and the side wall, if present.
The hood must be made of fireproof material (e.g. fireproof plasterboard) and it must be internally flush with the

front profile and the side profile.