Avago Technologies 3ware 9650SE-12ML User Manual

Page 38

Advertising
background image

Chapter 3. Installing the Battery Backup Unit

34

3ware 9650SE Serial ATA RAID Controller Installation Guide

5

If you have a 4-port or 8-port 9650SE:

a

Hook the clips on the top of the battery module over the
slots on the top edge of the controller.

Figure 27. Clips on the battery module hook over slots on

the top edge of the half-height controller

Figure 28. Attaching the battery module to the half-height

controller

Advertising