Envision Peripherals NV3128 User Manual

Page 28

Advertising
background image

NV3128 RS-422A Machine-Control Routing Switch

2-4

8. Connect the AC line cord at the rear of the frame and to the input

AC, which powers up the NV3128. Ensure the system powers up

correctly.

a. LEDs on the Power Supply front panel should glow.
b. Measure the voltages at the DC tespoints on the Power

Supply. The value should be within +/- 1VDC of the value

silkscreened at the test point. (If no boards are plugged in, the

voltages will be very high, around ±9 and ±20 volts.)

9. Disconnect the AC line cord(s) from the PS2001 power supply(ies).

Secure the Power Supplies with the front panel captive latch screws.
10. Cable the system as explained later in this chapter.
11. Set jumpers on the Command Interpreter (older systems only) as

discussed later in this chapter.
12. Engage all active circuit modules. Ensure they are plugged into

their correct slots as silkscreened on the frame and front panels.
13. Re-connect the AC line cords.

a. LEDs on the active modules should glow, indicating power is

on.
b. As an extra precaution, measure the voltages at the DC test

points on each active module in the frame. The value should be

within +/-5% of the value silkscreened at the test point.

Advertising