Inserting the reservoir in your pump, 48 chapter: 4 – Energizer 715 User Manual

Page 70

Advertising
background image

48 Chapter: 4

Inserting the reservoir in your pump

If your reservoir is already inserted in your pump, continue to “Manual prime” on page 49.
You must do these steps in the order described. Your pump screen will show instructions to help you

with these steps. If you are practicing, do NOT insert the reservoir in your pump.

1

If you are using the pump for the first time, remove the shipping cap from the reservoir
compartment.

4

Attach the activity guard, if desired.

5

You must now do a manual prime as described in the next section.

CAUTION:

You must rewind your pump before installing a new reservoir. As part of the
pump’s function, it measures the reservoir volume. To ensure correct volume
measurements, your pump has been designed to require a rewind before you
insert your reservoir.

WARNING:

Do not insert the reservoir in the pump if you did not rewind. Doing so could
result in inaccurate insulin delivery.
Never insert the reservoir into the pump while the tubing is connected to your
body. Doing so could result in an accidental infusion of insulin.

2

Insert the reservoir into the top of the pump
case.

3

Turn the tubing connector approximately
1/2-turn clockwise until the connector is
seated. The tubing connector should be
aligned horizontally with the pump case as
shown here.

ACT

ESC

tubing connector

Advertising
This manual is related to the following products:

515