Installation, Inspecting your shipment, Site requirements – Enterasys Networks Enterasys Vertical Horizon VH-8G User Manual

Page 27

Advertising
background image

9033639

Installation 13

2. INSTALLATION

Inspecting Your Shipment

When you receive the shipment of your switch, check the package

contents and make sure you have the following items:

VH-8G switch

Mounting ears and mounting screws

Four rubber feet

ESD wrist strap

Power cord

RS-232 null-modem cable

Product documentation

Site Requirements

Before you install the switch, make sure the site meets the following

requirements:

Mounting
Provide a flat table, shelf surface, or an optional 19 in. (48.3 cm)

equipment rack.
Use an EIA standard equipment rack that is grounded and physically

secure.

Power source
Provide a power source within six feet (1.8 m) of the installation

location. This source must provide 100 VAC to 240 VAC at 50 Hz to

60 Hz, for 80 VA minimum power. Power specifications for the switch

are shown in Appendix A, “Technical Specifications.”

Primary voltage selection within the above ranges is
automatic and requires no user action.

VH-8g.book Page 13 Friday, November 17, 2000 5:29 PM

Advertising