Size and capacity of propane cylinders required – Enerco MH55FAV User Manual

Page 7

Advertising
background image

7

Operating Instructions and Owner’s Manual

Mr. Heater | Forced Air Propane Construction Heater

SIZE AND CAPACITY OF PROPANE
CYLINDERS REQUIRED

The charts below show the approximate size of the cylinder
required for these heaters. To use the chart:

1. Select the lowest air temperature expected (at the bottom of

the chart).

2. Move straight up to time of operation desired (left side of

chart).

3. Read the cylinder size required.

All heaters should have:

full cylinders
good air circulation
no frost on cylinders

MAXIMUM OPERATING TIME - HOURS

MAXIMUM OPERATING TIME - HOURS

MAXIMUM OPERATING TIME - HOURS

55,000 BTU/HR (16.1 kW)

85,000 BTU/HR (33.4 kW)

125,000 BTU/HR (49.1 kW)

AIR TEMPERATURE -

o

F (

o

C)

AIR TEMPERATURE -

o

F (

o

C)

AIR TEMPERATURE -

o

F (

o

C)

Use liquid

withdrawal

and a vaporizer

Advertising