Optional blower installation instructions – Empire Products RH-50-6 User Manual

Page 16

Advertising
background image

12822-3-0406

Page 16

OPTIONAL BLOWER INSTALLATION INSTRUCTIONS

FRB-3 For Vented Room Heaters

Models

RH-50-(1, 2, 3, 4, 5, 6) RH-50C-1

RH-65-(1, 2, 3, 4, 5, 6) RH-65C-1

Figure 1

Figure 2

Figure 3

Figure 4

Installing Optional Blower

1. Remove rear shield (2 screws) and bottom reflector (4 screws).

(See Figure 1)

2. Align blower cushion with bottom assembly air discharge

opening. Foil face side of blower cushion should be placed

upward.

3. Align blower housing with blower cushion and use two #10

x 1/2” (13mm) hex-head screws to attach blower housing to

bottom assembly. (See Figure 2)

4. Save bottom reflector and rear shield (removed in Step 1) in

the even the blower housing is removed from room heater.

Attention! Bottom reflector and rear shield must be at-

tached to bottom assembly whenever the blower housing

in removed from the room heater and the room heater is

in operation.

5. Remove switch box cover from the switch box by removing

the #8 x 1/4” (6mm) hex-head screw.

6. There are two screw holes on the lower back of the combus-

tion chamber. Use only the left screw hole for mounting.

7. With the switch box perpendicular to the combustion chamber,

align the round clearance hole on the switch box with the left

screw hole on the combustion chamber (See Figure 3).

8. Attach switch box to the combustion chamber using the #10

x 1/2” (13mm) hex-head screw provided.

9. Attach switch box cover to the switch box by using the #8 x

1/4” (6mm) hex-head screw. (See Figure 4)

Advertising