Checking the external volume details, Checking the external volume details -26, Ldev information – Hitachi MK-96RD626-07 User Manual

Page 118

Advertising
background image

5-26

Performing Universal Volume Manager Operations

Hitachi Universal Storage Platform V/VM Universal Volume Manager User’s Guide

To replace all the current cross-subsystem paths (A and B) with newly-added
cross-subsystem paths (C and D):
1. Execute the Disconnect Paths command on the cross-subsystem path A.
2. Disconnect the cable which the cross-subsystem path A uses, and connect

the cable which the cross-subsystem path C uses.

3. Cancel the configuration of the cross-subsystem path A, and add the cross-

subsystem path C.

4. Click Apply to apply the settings of the cross-subsystem paths A and C.
5. Make sure the status of the cross-subsystem path C is Normal.

At this point, the cross-subsystem paths B and C are configured as normal

paths.
Take the following steps to delete the cross-subsystem path B and add the

cross-subsystem path D.

6. Execute the Disconnect Paths command on the cross-subsystem path B.
7. Disconnect the cable which the cross-subsystem path B uses, and connect

the cable which the cross-subsystem path D uses.

8. Cancel the configuration of the cross-subsystem path B, and add the cross-

subsystem path D.

9. Click Apply to apply the settings of the cross-subsystem paths B and D.
10. Make sure the status of the cross-subsystem path D is Normal.

Checking the External Volume Details

You can check the details on the mapped external volume using the LDEV

Information dialog box, and the details on the mapping path using the
Mapping Path Information dialog box.

To check the external volume details:
1. Start Storage Navigator, and open the Volume Operation window.
2. Click the path group in the Volume Operation tree.
3. Right-click the external volume that you want to check in the Volume

Operation list.

4. Click the following command in the pop-up menu.

LDEV information: Displays the LDEV Information dialog box.

Mapping Path Information: Displays the Mapping Path Information

dialog box.

5. Verify the details in the displayed dialog box.
6. Click Close to close the displayed dialog box.

You are returned to the Volume Operation window.

Advertising