Planning, Setting up at jobsite, Fm5 operator’s manual – Ditch Witch FM5 User Manual

Page 25

Advertising
background image

Operation Overview - 24

FM5 Operator’s Manual

Planning

CMW

Planning

1.

Gather information about jobsite (page 28).

2.

Inspect jobsite (page 28).

3.

Check supplies and prepare equipment (page 30).

Setting Up at Jobsite

1.

Prepare jobsite (page 29).

2.

Position fluid unit and connect to drilling unit. See drilling unit operator’s manual.

3.

Block trailer wheels.

IMPORTANT: Leave unit hitched to towing vehicle or properly stabilized.

Advertising