Hearth and Home Technologies BIR42 User Manual

Page 39

Advertising
background image

39

Center of Fireplace Opening

Round end of Rod through rings,
then into Screen Rod Clip

The noncombustible finishing
material across the top of
fireplace opening will be even
with lower edge of metal face.

Noncombustible finishing
materials MUST overlap
side faces by 1 1/4 in. (32 mm)
to cover the edges of the
panels. Finished opening
should be 38 x 42 in. (965 x
1067 mm) to allow for door
installation.

Mortar should be applied
after finishing material is
installed. Mortar will be
applied between finishing
materials and molded
brick edges, bottom and
sides.

The seam between
finishing materials and
firebox top must be sealed
with non-combustible
sealant.

The surface of the finished hearth extension and
the surface of the hearth panel should be level.

F. Install Mortar

Tools Required:

Mortar bag

Drill

Trowel

3/32 drill bit (provided)

Mixing bucket

Phillips screwdriver

Sponge or spray bottle

Joint striker

Drill with mixing attachment (optional)

Bucket of water

Figure 11.3 Facing Materials and Mortar

G. Install Screens

• Remove one screen rod by removing

one screw (near the center of the top
front). Pull rod out of the hole. Keep
the screw.

• Lay one screen panel fl at and slide the

round end of the rod through the rings
starting at the handle side of screen.
Leave the last ring off the rod.

• Insert the rod through the hole in the

bracket. Slip the last ring over the rod
on the other side of the bracket.

• Fasten

the

fl at end of the screen rod

back in place using the screw removed
earlier.

• Repeat for the other screen panel.

• Mix approximately 1/3 of the mortar material with 1/2

gallon of water in the mixing bucket. Stir the mixture with
the mixing attachment and drill. The consistency should
allow the material to be squeezed from the mortar bag but
not too runny.

• Fill the mortar bag with the prepared mixture.
• Apply mortar by squeezing the material from the mortar

bag into the joint lines. If fi lling a vertical line, start from
the top and work down. Apply slowly. Mixture should be
fl ush or higher than the panel surface.

• Mix more material as necessary to fi nish the job and then

let the unit set until fi rm, may take two hours or more.

• Thoroughly clean the bag, tools and mixing bucket.
• Use a joint striker and strike the material in the joints. The

excess material should fall off somewhat dry.

• Sweep the loose material off the fl oor of the unit.
• Final cleanup with sponge and water.
VERY IMPORTANT: Allow the mortar 72 hours to cure

before operating the fi replace.

Figure 11.4 Install Screens

Rod Screen
Clip

Inside

Firebox

Top of Fireplace

The mortar material provided should be suffi cient to com-
plete the installation of the molded brick panels without
considerable waste.

Note: We recommend mortar be applied after
facing materials are installed.

NOTICE: Do not substitute for HHT mortar. Other materials
may stain the molded brick panels.

Heatilator • Birmingham BIR42 • 4059-308 Rev E • 08/08

Advertising