Installation procedure – haier AB422ACERA User Manual

Page 27

Advertising
background image

(2) Check if water drainage is smooth after installation.

Charge, through air outlet or inspecting hole, 1200ccd water to see water drainage.

After wiring

Remove cover of control box, connect 1PH power to terminal 1 and 2 on terminal block.,use remote
controller to operate the unit.
Note, in this operation, fan will be running.
Upon confirmation of a smooth water drainage, be sure to cut off power supply.

Check water drainage in cooling operation.

25

Method of water charging

Charge water from
air outlet

Charge water from
inspecting hole

Watering can of plastic
pipe should be about
100 mm long

100mm

Water drainage port for
maintenance

(Drain water from
this hole)

Self-provided stiff pipe

Maintenance

Inspecting hole

1 2 3 D

OUTDOOR UNIT
TERMINAL BLOCK

INDOOR UNIT
TERMINAL BLOCK

POWER SUPPLY:

380-400V,3N~,50Hz

R S T N 1 2 3

1 2 3

Y/G

Y/G

Y/G

1 2 3

1PH,220-230V~,50Hz

POWER SUPPLY:

INDOOR UNIT
TERMINAL BLOCK

L N

1 2 3

Y/G

(For series 242, 282, 362, 422, 482, 602 )

(For series 362, 422, 482, 602 )

(For series 242, 282 )

OUTDOOR UNIT
TERMINAL BLOCK

When wiring is not complete

Cover of controll box

PCB on

indoor unit

Terminal block

Connect with
outdoor unit

Terminal block

Installation Procedure

Advertising
This manual is related to the following products: