Hubbell Electric Heater Company V20 User Manual

Page 21

Advertising
background image

21

IMMERSION TEMPERATURE HIGH LIMIT CUT-OFF

1. Disconnect power from unit.
2. Remove access cover.
3. Remove high limit cover screw and cover.

Cover

Cover Screw

Reset Switch

4. Disconnect the two (2) 14 gauge wires.

Wires

Capillary

Tube

5. Remove capillary tube and bulb from thermowell

6. Remove two (2) mounting screws.

Mounting Screws

7. Remove control and install new high limit switch by performing above steps in reverse order.

(Note: Be sure to place capillary tube into slot in base prior to installing cover.)

Advertising
This manual is related to the following products:

V10