Quick set up 2 – Heat Controller PE-91A PE-121A User Manual

Page 4

Advertising
background image

4

Heat Controller, Inc.



1900 Wellworth Avenue



Jackson, MI 49203

QUICK SET UP

2.

Unpack the unit:

• Remove the foam cap.
• With two people, lift and

remove the unit from the
foam packing base
without tilting the unit.

• Remove the plastic bag.

Check to see if unit is complete
including all parts and
accessories (Ref. Section 6,
Parts & Accessories).

Test LCDI Plug. (Ref. Section
7, Safety Rules).

Place the unit UPRIGHT to
allow the refrigerant and oil to
stabilize. Wait 3 hours before
using. (Ref. Section 7,
Safety).

Attach air inlet and air outlet hose. Follow instructions per Section 8,
Installation.

Plug the unit into a properly grounded 15 Amp, 115V AC, circuit. (Ref.
Section 7, Safety Rules).

Follow Section 9, Operation to set preferred function mode. When
Water-Full indicator illuminates, empty the residual condensate water. (Ref.
Section 10, Drain Excess Condensate Water).

Handle your unit with care. Move it gently. Always keep air filter clean.
Do not cover air inlet grid and air outlet grid.

Advertising