Hunter Fan 34203 User Manual

Page 7

Advertising
background image

©2008 Hunter Fan Co.

41785 Rev 05-06-2008

7

Atomizer

Posts

Pump Cap

Funnel

Pump

Funnel

Pump

Arrows

Pump

Cap

3. Place the Atomizer in the Upper Reservoir, aligning the

three oval holes in the Atomizer with the three prongs in the

Upper Reservoir. The side of the Atomizer with three short

posts should be facing upward. See Figure 17.

Figure 17

4. Assemble the Pump Cap and the Funnel Pump by aligning

the arrows on both components and inserting the Funnel

Pump into the Pump Cap. Twist the Funnel Pump counter-

clockwise until the two components snap together. See

figures 18a and 18b.

Figure 18a

Figure 18b

5. Attach the Funnel Pump Assembly to the Power Pack by

engaging the three tabs on the underside of the fan blade.

See Figure 19.

Power Pack

Funnel Pump

Assembly

Tabs

Fan Blade Under-

side

Figure 19

6. Place the Power Pack into the Upper Reservoir so that the

three prongs in the Power Pack go through all three holes

in the Atomizer and into the three prongs in the base of the

Upper Reservoir. Make sure the Power Pack is securely

seated and all three prongs are in the proper position. See

Figure 20.

Upper

Reservoir

Power Pack

Atomizer

Holes in the

Atomizer

Figure 20

NOTE: The prongs will only fit into the Upper Reservoir one

way.

7. Follow the directions in the section

REFILLING THE WATER

TANK to complete reassembly.

Advertising
This manual is related to the following products: